Sign inGet alerts

F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20

DEPT OF DEFENSE, Oklahoma · DEPT OF THE AIR FORCE · F3YCCF 448 SCMW
Responses dueMon, Nov 3011:00 PM CT · Oklahoma time49 days left
PostedThu, Mar 13, 2025No amendments since
Solicitation no.F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The DEPT OF DEFENSE is seeking a qualified source to produce the Trailing Edge, Aircraft. Offers will be evaluated based on qualification requirements.

Scope

  • Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the
  • Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission
Not a solicitation — no awardDays to respond: 49

How to get the bid documents

  1. Download the 1 document below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 11:00 PM CT on Nov 30
Documents · 1 item, 1 file
  • DOCX
    JUSTIFICATION FOR QUALIFICATION REQUIREMENTS FAR 9.docx15 KB
Open the original listing on SAM.gov

Details

Place of performance
Tinker AFB, Oklahoma
Buyer type
Federal
Notice type
Sources Sought
Solicitation no.
F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20
Category
Supplies & Equipment · beta
Contract type
not stated from notice
Evaluation
n/a, market research from notice
NSN
1560-01-725-3383 from notice
Part number
202312284-20 from notice
Local presence
Not required
Amendments
None since Mar 13, 2025
Contact
Tracey Beringer
Office
DEPT OF THE AIR FORCE · F3YCCF 448 SCMW
Email
tracey.beringer@us.af.mil
Phone
777-2211

Not stated in the notice: estimated value, period of performance, quantity, FOB terms. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Mar 13, 2025Posted
Not statedQuestions due
Mon, Nov 30, 2026 · 11:00 PM CTResponses due · 49 days left

Change log

verified Sun, Oct 11 · 11:30 PM CT

No amendments since posting on Thu, Mar 13, 2025; verified Sun, Oct 11 · 11:30 PM CT.

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20

  1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a.

Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b.

Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c.

Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured. 2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a.

Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award. b.

Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $4000. c.

Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the Trailing Edge, Aircraft and other factors.

Award history

USAspending.gov, last 36 months

Award history for this agency is not loaded yet.

Awards for this key have not been synced yet.

This contracting office

5 other open notices from this office · buys mostly Other, Supplies & Equipment, Equipment Maintenance & Repair

Similar open RFPs in Oklahoma

same contracting office

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov