Sign inGet alerts

Closed Mon, Oct 5, 2026. Responses were due Mon, Nov 3, 2025 · 10:00 AM MT. This notice is kept for reference and no longer takes responses.

Special noticeFederal buyer

F--Upper Tenmile Mining Creek District - New Task Order - Design and Engineering S

ENVIRONMENTAL PROTECTION AGENCY, Colorado · ENVIRONMENTAL PROTECTION AGENCY · REGION 8 CONTRACTING OFFICE
Unverified · check source
Responses dueMon, Nov 3, 202510:00 AM MT · Colorado timeClosed
PostedThu, Oct 16, 2025No amendments since
Solicitation no.68HE08-26-R-0001SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

from the notice as published

RAF DES Upper Tenmile Mining Creek District - This Task Order begins the remedial design portions for the Susie, Lee Mountain, and Red Water Adits within the Site boundaries. It will accomplish this through several years of synoptic sampling events, as well as several studies to conclude the Phase 4 approach to water treatment specified in the ROD. The work will culminate with a conceptual site…

How to get the bid documents

Attachment list not pulled yet; check the source notice.

Open the original listing on SAM.gov

Details

Place of performance
DENVER, Colorado
Buyer type
Federal
Notice type
Special Notice
Solicitation no.
68HE08-26-R-0001
NAICS
NAICS 562910 (Remediation Services): 10 open RFPs
Size standard
$25M revenue SBA table, NAICS 562910
PSC
PSC F108 (ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION): 10 open RFPs
Amendments
None since Oct 16, 2025
Contact
Keefer, Nicole
Office
REGION 8 CONTRACTING OFFICE
Email
keefer.nicole@epa.gov
Phone
(303) 312-6177

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Oct 16, 2025Posted
Not statedQuestions due
Mon, Nov 3, 2025 · 10:00 AM MTResponses due · closed
Closed
Mon, Oct 5, 2026

Change log

verified Tue, Oct 6 · 10:30 PM MT
  1. Posted · Special NoticeThu, Oct 16, 2025 · 4:28 AM MT
  2. ClosedMon, Oct 5, 2026 · 4:52 AM MT

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

F--Upper Tenmile Mining Creek District - New Task Order - Design and Engineering S

RAF DES Upper Tenmile Mining Creek District - This Task Order begins the remedial design portions for the Susie, Lee Mountain, and Red Water Adits within the Site boundaries. It will accomplish this through several years of synoptic sampling events, as well as several studies to conclude the Phase 4 approach to water treatment specified in the ROD. The work will culminate with a conceptual site model and treatability study for remedial design of the Susie, Lee Mountain, and Red Water Adits.

What this office paid before

USAspending.gov, last 36 months

16 awards matched · tier 1: this contracting office (68HE08) + PSC F108. Most recent:

  • Sep 25, 2026AECOM TECHNICAL SERVICES, INC.BILLINGS PCE (08ME) - NEW TASK ORDER: REMEDIATION ENVIRONMENTAL SERVICES FOR THE INSTALLATION OF VARIOUS RESIDENTIAL MONITORING, MITIGATION,68HE0826F0061 · DELIVERY ORDER · Environmental Protection Agency · ends Dec 30, 2029$5.4M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 10, 2026 · 9:34 PM MT.

Similar open RFPs

same PSC F108

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov