Sign inGet alerts

Compliance checklist

Dock-side (DS): USCGC KIMBALL Quarter 3 FY27 Repair · DOCKSIDE-REPAIRS-Quarter-3-FY27-CGC-KIMBALL. 144 requirement sentences found in the notice and 2 attachments: every "shall", "must" and "required", quoted as written and sorted into submission requirements (3) and performance / contract clauses (141). Nothing is generated.

Pro

The full checklist is a Pro feature

144 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.

Sign in or upgrade

Submission requirements · 3

04b557df11c14b239500b206698604b4.docx · TANK CAPACITIES · 1

04b557df11c14b239500b206698604b4.docx · 3 Inch Slats and Roller End lock Assembly · 2

Performance / contract clauses · 141

04b557df11c14b239500b206698604b4.docx · TANK CAPACITIES · 2

04b557df11c14b239500b206698604b4.docx · Unlabelled section · 2

Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.