Sign inGet alerts

Compliance checklist

DOC 5JD 150 DSM ST Renovation · RFB948100-01. 47 requirement sentences found in the notice and 5 attachments: every "shall", "must" and "required", quoted as written and sorted into submission requirements (1) and performance / contract clauses (46). Nothing is generated.

Pro

The full checklist is a Pro feature

47 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.

Sign in or upgrade

Submission requirements · 1

RFB948100-01 - Drawings · BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCC · 1

Performance / contract clauses · 46

RFB948100-01 - Drawings · THE DEMOLITION DRAWINGS ARE A SUMMARY AND WILL NOT SHOW ALL SPEC · 1

RFB948100-01 - Drawings · REFER TO MEPT DRAWINGS FOR EXTENTS OF MEPT DEMOLITION WORK · 1

Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.