Sign inGet alerts

District 9 Traffic and Mobility - Bitters Area (2022 Bond)

Responses dueTue, Oct 202:00 PM CT · Texas time4 days left
PostedFri, Sep 18No amendments since
Solicitation no.23-03895ATexas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL)
Set-asideNoneOpen to all firms
Estimated value$767Kfrom notice

What the city is buying

by RFPFinder from the notice and attachments; the solicitation governs

The City of San Antonio seeks bids for traffic signal installation, sidewalk work, and mill-and-overlay paving at two intersections in the Bitters area. Sealed bids are due October 20, 2026, evaluated as lowest responsive responsible bidder.

Scope

  • Traffic signals, sidewalks with ramps, and mill-and-overlay paving at Ashton Village/Cutter Green and Rogers Wood/Inwood Cove intersections.
  • Flashing stop signs and sidewalk replacement to match existing exposed aggregate surfaces.
Submission: portalDays to respond: 4

How to get the bid documents

  1. Download the 1 document below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit by portal before 2:00 PM CT on Oct 20
Documents · 1 item, 1 file
  • PDF
    Solicitation Synopsis - D9 Traffic & Mobility - Bitters Area.pdf87 KB · 1 page
Open the original listing on the agency portal

Details

Place of performance
Texas
Buyer type
City
Notice type
Not stated
Solicitation no.
23-03895A
Category
Construction · beta
Estimated value
$767K from notice
Local presence
Not required
Amendments
None since Sep 18
Contact
Renuka Naidu
Email
renuka.naidu@sanantonio.gov
Phone
(210) 207-0599

Not stated in the notice: contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Sep 18Posted
Not statedQuestions due
Tue, Oct 20 · 2:00 PM CTResponses due · 4 days left Under 14 days

Change log

verified Fri, Oct 16 · 7:16 AM CT

No amendments since posting on Fri, Sep 18; verified Fri, Oct 16 · 7:16 AM CT.

Report a problem

Notice as published

District 9 Traffic and Mobility - Bitters Area (2022 Bond)

Project includes installation of traffic signals at the Ashton Village/Cutter Green intersection, new sidewalks with ramps, mill and overlay at intersection at the Rogers Wood/Inwood Cove to include flashing stop signs and sidewalk replacement to match existing adjacent exposed aggregate sidewalks.

Responses submitted at: https://www.civcastusa.com/ Posting requirement: 21+ Days for Solicitation Notice

NIGP codes: 91350 Construction, Street (Major And Residential)(Includes Reconstruction); 91360 Construction, Water System/Plants, Main And Service Line

Listing collected from Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site