What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe National Laboratory of the Rockies is seeking design-build services for new perimeter security fencing along the North boundary of the South Table Mountain Campus. This will be a firm-fixed-price contract awarded using the Lowest Price Technically Acceptable evaluation method.
Scope
- Design and install new perimeter security fencing.
- Remove designated sections of existing chain-link fence.
1 signal behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.
From USAspending awards and the notice text, recomputed nightly (Oct 8). A signal, not a verdict.
How to get the bid documents
- Download the 4 stored documents below; 2 more open at the source
- Check the submission requirements in the compliance checklist
- Submit by portal before 5:00 PM MT on Nov 11
Details
- Place of performance
- Golden, Colorado
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- RFP-2027-27107
- Category
- Supplies & Equipment
- Size standard
- $19M revenue SBA table, NAICS 238990
- Delivery location
- South Table Mountain (STM) Campus, National Laboratory of the Rockies from notice
- Period of performance
- 360 days from subcontract execution from attachment p.3
- Contract type
- Firm-fixed-price from attachment p.3
- Evaluation
- Sealed bid, price only (FAR 14) from attachment
- Local presence
- Not required
- Amendments
- 1, last Oct 7
- Contact
- Stephen Cummock
- Office
- ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR
- Phone
- 9702170997
Not stated in the notice: estimated value, quantity, FOB terms. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.
Key dates
- Amendment 1
- Wed, Oct 7
Change log
verified Thu, Oct 8 · 3:00 PM MT- Posted · SolicitationWed, Oct 7 · 11:33 AM MT
- Amendment · New version of the notice posted at the sourceWed, Oct 7 · 6:00 PM MT
Report a problem
Notice as published
Design-Build Services – STM Security Fencing - North Boundary
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.
Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR's design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO).
Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR's required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats.
Throughout the effort, the Subcontractor must maintain alignment with NLR's design?to?cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR's safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required.
Waste prevention, recycling, and proper tracking of off?site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on?site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols.
At project completion, the Subcontractor must deliver accurate as?built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR's Beneficial Occupancy process.
Similar federal awards · PSC 5660
USAspending.gov, last 36 months25 awards matched · tier 3: PSC 5660 at any agency; nothing from this office or agency. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards for this key have not been synced yet.
This contracting office
1 other open notice from this office · buys mostly Supplies & Equipment, Other
Similar open RFPs
same PSC 5660Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.