Get alerts

Construction Management & Inspection Services - Cherry Avenue Sewer Improvement Project (SC-0512)

City of Long Beach, California · Engineering Bureau
Verified 2 h agoLocal presence required
Responses dueThu, Oct 292:00 PM PT · California time21 days left
PostedMon, Sep 28No amendments since
Solicitation no.UD-26-362California DGS - Cal eProcure / California State Contracts Register (CSCR)
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice and attachments; the solicitation governs

The City of Long Beach Public Utilities Department is seeking construction management and inspection services for the Cherry Avenue Sewer Improvement Project. This will be a best value contract, and proposals will be evaluated based on the offeror's ability to provide the requested services.

Scope

  • Construction management and inspection services for sewer line installation.
  • Includes new sewer lines, maintenance holes, dewatering, and pavement work.
Local presence requiredSubmission: portalDays to respond: 21

How to get the bid documents

  1. Download the 3 stored documents below; 1 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by portal before 2:00 PM PT on Oct 29
Documents · 4 items, 4 filesDownload all (zip) · Pro
  • PDF
    Request for Proposals9.6 MB · 95 pages
  • DOC
    Construction SpecificationsToo large, open at source
  • PDF
    Project Plans8.3 MB · 11 pages
  • PDF
    Project Traffic Control Plans6.8 MB · 22 pages
Open the original listing on the agency portal

Details

Place of performance
California
Buyer type
City
Notice type
Request for Proposal
Solicitation no.
UD-26-362
Categories
Architecture & Engineering · beta, Construction
Delivery location
Long Beach, CA from attachment p.1
Period of performance
2027-01-01 to 2027-07-01 from notice
Local presence
Required
Amendments
None since Sep 28
Contact
Matthew Cruz
Office
Engineering Bureau
Email
Matthew.Cruz@lbwater.org
Phone
(562) 570-2332

Not stated in the notice: estimated value, contract type. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Mon, Sep 28Posted
Thu, Oct 15 · 10:00 AM PTPre-bid meeting
Thu, Oct 29 · 2:00 PM PTResponses due · 21 days left

Change log

verified Thu, Oct 8 · 11:17 PM PT

No amendments since posting on Mon, Sep 28; verified Thu, Oct 8 · 11:17 PM PT.

Report a problem

Notice as published

Construction Management & Inspection Services - Cherry Avenue Sewer Improvement Project (SC-0512)

The Work consists of Construction Management and Inspection Services for the Cherry Avenue Sewer Improvement Project. The project includes, but is not limited to: the installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line and new sewer maintenance holes; removal, replacement or abandonment of existing sewer lines and manholes; dewatering; sewer flow bypassing; video inspection; pavement work; trenching; backfilling and compacting.

Pre-bid conference: Bidders are encouraged to attend an optional virtual pre-bid meeting at 10 am, Thursday Oct. 15, 2026 and must request an invitation to the meeting by emailing [email on the source notice] with the email subject line: "RSVP-CMS Cherry Ave Sewer Project."

Contract period: 01/01/2027 to 07/01/2027

Listing collected from California DGS - Cal eProcure / California State Contracts Register (CSCR). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site