Sign inGet alerts

Closed Thu, Oct 8. Responses were due Thu, Oct 8 · 2:00 PM PT. This notice is kept for reference and no longer takes responses.

Invitation for bidsPublic buyer

COLLECTION SYSTEM CONSTRUCTION SERVICES FY 26-27

Unverified · check source
Responses dueThu, Oct 82:00 PM PT · Nevada timeClosed
PostedTue, Sep 1No amendments since
Solicitation no.26100Nevada State Purchasing Division - NevadaEPro
Set-asideNoneOpen to all firms

What the county is buying

from the notice as published

SCOPE OF WORK: The Work may consist of all or part of the following: cured-in-place pipe (CIPP) lining; manhole repair and coating; removal and replacement of pipelines, pipe segments, and manholes; repairing manhole frames, covers, collars, and adjusting grade rings; construction of new gravity sewer pipelines and manholes, abandoning pipelines and manholes; lateral connections; notifying 811…

Q&A closed

How to get the bid documents

To submit, you need a free account at Nevada State Purchasing Division - NevadaEPro.

Documents · 2 items, 2 filesDownload all (zip) · Pro
  • PDF
    Bid Invitation.pdf179 KB · 9 pages
  • PDF
    Public Question & Answer.pdf85 KB · 2 pages
Open the original listing on the agency portal

Details

Place of performance
Nevada
Buyer type
Public
Notice type
IFB
Solicitation no.
26100
Amendments
None since Sep 1
Contact
Larry Silver - Utility Sourcing Analyst
Phone
(702) 668-8090

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline has passed.

Key dates

Tue, Sep 1Posted
Sep 22Q&A closed
Thu, Oct 8 · 2:00 PM PTResponses due · closed
Closed
Thu, Oct 8

Change log

verified Thu, Oct 8 · 9:44 AM PT
  1. Posted · IFBTue, Sep 1 · 12:00 AM PT
  2. ClosedThu, Oct 8 · 7:58 PM PT
Report a problem

Notice as published

COLLECTION SYSTEM CONSTRUCTION SERVICES FY 26-27

SCOPE OF WORK: The Work may consist of all or part of the following: cured-in-place pipe (CIPP) lining; manhole repair and coating; removal and replacement of pipelines, pipe segments, and manholes; repairing manhole frames, covers, collars, and adjusting grade rings; construction of new gravity sewer pipelines and manholes, abandoning pipelines and manholes; lateral connections; notifying 811 One Call center; coordinating with utility owners, homeowners and other contractors; obtaining permits; bypass pumping; planning, setting, and removal of barricades, cutting asphalt; compacting backfill; surface restoration; and all other appurtenant work required.

The Site of Work is located at various areas throughout Las Vegas Valley.

ESTIMATED COST: The Engineer's estimate is in the $7,900,000.00 to $9,200,000.00 range.

Responses due: 10/8/2026 2:00 PM PT Questions due: 9/22/2026 5:00 PM PT

Listing collected from Nevada State Purchasing Division - NevadaEPro. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site