What the city is buying
by RFPFinder from the notice and attachments; the solicitation governsThe City of Adairsville is purchasing and installing a 75Hp Backwash Pump at its existing Water Plant to provide redundancy. This is a construction project for a specific piece of equipment, with evaluation details not specified.
Scope
- Purchase and install 75Hp Backwash Pump at Water Plant.
- Includes concrete pad, piping, electrical, testing, and training.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 1 document below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit as the notice directs before 10:00 AM ET on Nov 3
Details
- Place of performance
- Georgia
- Buyer type
- City
- Notice type
- Non-State Agency
- Solicitation no.
- PE-60855-NONST-2026-000000016
- Category
- Construction
- Quantity
- 1 each from notice
- Delivery location
- City of Adairsville Water Plant from notice
- Local presence
- Not required
- Amendments
- None since Sep 21
Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Sat, Oct 10 · 2:15 AM ETNo amendments since posting on Mon, Sep 21; verified Sat, Oct 10 · 2:15 AM ET.
Report a problem
Notice as published
City of Adairsville Water Plant Backwash Pump
The Project includes all material, labor, and related appurtenances for the purchase and installation of a 75Hp Backwash Pump at the existing Water Plant for use as an additional Water Plant Backwash Pump, providing redundancy at the facility. The Work also includes building a concrete pad for the pump and motor (with appropriate anchoring/dowelling to the existing concrete floor); the provision, install, and coordination of associated piping, fittings, and valves to connect to the existing Backwash System; addition of a check valve on existing backwash line; electrical wiring from the motor to the control panel (conduit pipe already in place); start up and testing of the system after installation; training for system use; all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete, working, additional Backwash Pump at the Water Plant. SCADA system integration will be coordinated by Owner with their existing system integrator and paid for through the Allowance Item.
Listing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.