What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe Department of Energy's Fermilab is seeking a general contractor for the addition and renovation of its Central Utility Building (CUB). This is a construction contract where the general contractor will furnish all supervision, labor, materials, tools, and equipment.
Scope
- Build an addition and renovate the Central Utility Building (CUB) at Fermilab.
- Furnish all supervision, labor, materials, tools, and equipment for the construction project.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 36 stored documents below; 5 more open at the source
- Check the submission requirements in the compliance checklist
- Submit by unknown before 4:00 PM CT on Nov 17
Details
- Place of performance
- Batavia, Illinois
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- RFP-376508-CD
- Category
- Construction
- Size standard
- $45M revenue SBA table, NAICS 236210
- Delivery location
- Fermi National Accelerator Laboratory (Fermilab) Site, Batavia, Illinois from attachment p.9
- Period of performance
- January 1, 2028 - January 1, 2030 from notice
- Local presence
- Required
- Amendments
- 5, last Oct 7
- Contact
- Chris Daley
- Office
- FERMILAB - DOE CONTRACTOR
- cdaley@fnal.gov
- Phone
- 6308404256
Not stated in the notice: estimated value, contract type. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Tue, Oct 6
- Amendment 2
- Tue, Oct 6
- Amendment 3
- Tue, Oct 6 · The original procurement notice has been updated with additional details about the project scope, timeline, and milestones.
- Amendment 4
- Tue, Oct 6 · The original procurement notice has been updated with additional details about the project scope, timeline, and milestones.
- Amendment 5
- Wed, Oct 7 · description text changed
Change log
verified Wed, Oct 7 · 11:30 PM CT- Posted · SolicitationThu, Sep 17 · 5:49 AM CT
- Amendment · New version of the notice posted at the sourceTue, Oct 6 · 12:00 PM CT
- Amendment · New version of the notice posted at the sourceTue, Oct 6 · 7:00 PM CT
- Amendment · The original procurement notice has been updated with additional details about the project scope, timeline, and milestones.Tue, Oct 6 · 11:30 PM CT
- Amendment · The original procurement notice has been updated with additional details about the project scope, timeline, and milestones.Tue, Oct 6 · 11:31 PM CT
- Amendment · description text changedWed, Oct 7 · 11:31 PM CT
- Updated · description text changedWed, Oct 7 · 11:31 PM CT
Report a problem
Notice as published
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements.
It is vital to Fermilab's mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab's accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 Issuance of Notice to Proceed (NTP) to 30th December 2027.
This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 31st January 2029; AUP 1 CUB Extension complete.
Milestone 4 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Similar federal awards · PSC Z2EZ
USAspending.gov, last 36 months25 awards matched · tier 3: PSC Z2EZ at any agency; nothing from this office or agency. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Tue, Oct 6, 2026 · 6:14 AM CT.
This contracting office
8 other open notices from this office · buys mostly Supplies & Equipment, Construction, Janitorial & Cleaning
Similar open RFPs
same PSC Z2EZListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.