What the county is buying
by RFPFinder from the notice; the solicitation governsKing County is soliciting bids to design, furnish, and install a pilot-scale micro-electrolysis treatment system at Cedar Hills Regional Landfill to pretreat industrial wastewater. Award will be made to the lowest responsive responsible bidder via sealed bid.
Scope
- Furnish and install pilot-scale micro-electrolysis reactor, platform, and treatment system equipment
- Obtain permits, perform utility hookups, hydrostatic testing, commissioning, and final system testing
How to get the bid documents
- Open the notice on Washington DES - WEBS (Washington's Electronic Business Solution)
- Read the notice; the source lists no attachments
- Submit by portal before 1:30 PM PT on Oct 27
The source notice lists no attachments.
Open the original listing on the agency portalDetails
- Place of performance
- Washington
- Buyer type
- County
- Notice type
- Construction Solicitation
- Solicitation no.
- KC001738,1
- Category
- Construction
- Delivery location
- Cedar Hills Regional Landfill, King County, Washington from notice
- Local presence
- Not required
- Amendments
- None since Oct 5
- Contact
- Annette Hansford
Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Fri, Oct 9 · 11:17 PM PTNo amendments since posting on Mon, Oct 5; verified Fri, Oct 9 · 11:17 PM PT.
Report a problem
Notice as published
Cedar Hills Regional Landfill Pilot-Scale Micro-Electrolysis
The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF. The pilot-scale ME technology and treatment system has been selected to pretreat the industrial wastewater stream from the methane processing plant prior to the stream entering the leachate lagoon pretreatment system. The experimental ME technology was developed by the University of Washington (UW) and designed at current scale by WSP USA (WSP).
CHRLF discharges industrial wastewater collected at the landfill to the King County publicly owned treatment works (POTW) in Renton, Washington, under Waste Discharge Permit No. 7842-04 (discharge permit), issued to the County by the King County Industrial Waste (KCIW) program. The Work includes but is not limited to the following features:
- Obtain all permits necessary to perform the Work. 2.
Furnish and installation of ME reactor and platform foundation slab and stairway foundation slab, including all required anchoring. 3. Furnish and installation of pilot-scale ME treatment system equipment, interconnecting piping and valves, and instrumentation.
- Furnish initial bulk chemicals and media. 5.
Installation of site utility hookups to existing onsite power, including underground and above-grade connection points for the pilot system and associated installations. 6. Hydrostatic and leak testing.
- Pre-commissioning, commissioning, inspections, and final system testing.
Amendment: Addendum 1 has been issued. Suppliers must acknowledge all addenda before submitting a response. If a supplier has already submitted a response, they MUST log into the E-Procurement Supplier Portal, acknowledge the addendum, and resubmit.
Responses due: 10/27/2026 1:30 PM PDT
Solicitation files (download from the supplier portal): KC001738-addendum-1.pdf; KC001738-itb-documents.zip