Sign inGet alerts
Invitation for bidsConstructionState buyer

Bridge Replacement (Resurfacing, Grading, Drainage, Pavement, and Bridge) on SR-6 (Eastbound Roadway) from a point 0.200 mile east of the junction of Hargrove Church Road (MP 23.797) over Bear Creek northwest of Gordo

Responses dueFri, Nov 610:00 AM CT · Alabama time27 days left
PostedNot statedNo amendments since
Solicitation no.BR-0006(599)Alabama - Alabama Buys (Ivalua) + STAARS VSS
Set-asideNoneOpen to all firms
Estimated value$5.9Mfrom $4.8M · from notice

What the state is buying

by RFPFinder from the notice; the solicitation governs

Alabama Department of Transportation is soliciting bids for bridge replacement, resurfacing, grading, drainage, and pavement work on SR-6 eastbound near Gordo. This is an invitation for bids with award to the lowest responsive responsible bidder.

Scope

  • Bridge replacement and roadway resurfacing on SR-6 eastbound, 0.801 miles
  • Grading, drainage, pavement, and bridge work over Bear Creek near Gordo
Sealed bid — price onlySubmission: portalDays to respond: 27

How to get the bid documents

  1. Open the notice on Alabama - Alabama Buys (Ivalua) + STAARS VSS
  2. Download the 2 attachments listed below from the source
  3. Submit by portal before 10:00 AM CT on Nov 6

To submit, you need a free account at Alabama - Alabama Buys (Ivalua) + STAARS VSS.

Documents · 2 items, 2 files
  • DOC
    Proposal items (call 1)at source
  • DOC
    Notice to Contractorsat source
Open the original listing on the agency portal

Details

Place of performance
Alabama
Buyer type
State
Notice type
IFB
Solicitation no.
BR-0006(599)
Category
Construction
Delivery location
SR-6 eastbound, Pickens County, Alabama, near Gordo from notice
Period of performance
150 working days from notice
Evaluation
Sealed bid, price only from notice
Estimated value
$5.9M from notice
Local presence
Not required
Amendments
None

Not stated in the notice: contract type. Check the bid documents.

Key dates

Not statedQuestions due
Fri, Nov 6 · 10:00 AM CTResponses due · 27 days left

Change log

verified Sat, Oct 10 · 1:15 AM CT

No amendments since posting; verified Sat, Oct 10 · 1:15 AM CT.

Report a problem

Notice as published

Bridge Replacement (Resurfacing, Grading, Drainage, Pavement, and Bridge) on SR-6 (Eastbound Roadway) from a point 0.200 mile east of the junction of Hargrove Church Road (MP 23.797) over Bear Creek northwest of Gordo

Call 1, project BR-0006(599), Pickens County. For constructing the Bridge Replacement (Resurfacing, Grading, Drainage, Pavement, and Bridge) on SR-6 (Eastbound Roadway) from a point 0.200 mile east of the junction of Hargrove Church Road (MP 23.797) over Bear Creek northwest of Gordo. Length 0.801 mi.

Contract time: 150 Working Days.

Bracket estimate: $4,816,800 to $5,887,200 (ALDOT: brackets are general information, not for preparing a bid). A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $50.00 per set.

Letting: November 06, 2026 10:00 AM CDT. Bids through AASHTOWare Project Bids; Notice to Contractors and proposal items are linked.

Listing collected from Alabama - Alabama Buys (Ivalua) + STAARS VSS. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site