What the city is buying
by RFPFinder from the notice and attachments; the solicitation governsThe Fort Valley Utility Commission is purchasing labor for the construction of an electric primary feeder system. Offers will be evaluated based on sealed bids from qualified and licensed contractors.
Scope
- Construction and installation of a 7.2 kV phase-to-ground / 12.47 kV phase-to-phase, three-phase underground electric distribution system.
- Labor-only basis, with the Commission furnishing major electrical materials.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 2 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit by physical before 9:00 AM ET on Nov 10
Details
- Place of performance
- Georgia
- Buyer type
- City
- Notice type
- Non-State Agency
- Solicitation no.
- PE-33552-NONST-2027-000000021
- Category
- Construction
- Delivery location
- Fort Valley, Georgia from notice
- Evaluation
- Sealed bid, price only from notice
- Local presence
- Required
- Amendments
- None since Sep 28
- tgiles@fvutil.com
Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Sat, Oct 10 · 2:15 PM ETNo amendments since posting on Mon, Sep 28; verified Sat, Oct 10 · 2:15 PM ET.
Report a problem
Notice as published
BLUE BIRD EXPANSION
The Fort Valley Utility Commission (FVUC) will accept sealed bids from qualified contractors for labor associated with theconstruction of the electric primary feeder system serving the Blue Bird Expansion Project in Fort Valley, Georgia.The project generally consists of construction and installation of a 7.2 kV phase-to-ground / 12.47 kV phase-to-phase,three-phase underground electric distribution system, including undergroundprimary cable and conduit systems,pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding,terminations, testing, commissioning, and associated work as described in the Statement of Work and construction drawings.This project shall be bid on a labor-only basis. Fort Valley Utility Commission will furnish the major electrical materialsrequired for construction as identified in the Contract Documents. The Contractor shall furnish all labor, supervision, qualifiedpersonnel, construction equipment, tools, transportation, testing equipment, safety equipment, and other labor-related itemsnecessary to provide a complete installation of FVUC-furnished materials.The project completion date shall be TBD by Parrish Construction and Blue Bird.Bids will be considered only from experiencedand properly licensed contractors regularly engaged in electric utilityconstruction of similar type and magnitude.
All work shall comply with the applicable ECG Construction AssemblySpecifications for 12.5/7.2 kV Distribution Systems, FVUC standards and specifications, approved project drawings,manufacturer requirements, NESC, OSHA, Georgia 811, and applicable federal, state, and local requirementsTheStatement of Work and applicable construction drawings are included with or incorporated into the bid package MANDATORY PRE BID NOVEMBER 02 2026 AT 10:00AM 500 AnthoineStreet, FortValley, Georgia 31030. Contact Ray Martin at [email on the source notice] or 478-550-4385.
Listing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.