Sign inGet alerts
JustificationFederal buyer

Advancing HIV & AIDS Epidemic Control (AHEC) Project

STATE, DEPARTMENT OF, District of Columbia · STATE, DEPARTMENT OF · ACQUISITIONS - AQM MOMENTUM
Verified 18 h agoUpdated Oct 7 · AmendmentLocal presence required
Responses dueNot stated
PostedTue, Sep 151 amendment, last Oct 7
Solicitation no.72066821C00001P00025SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Department of State requires an increase in the contract ceiling for the Advancing HIV & AIDS Epidemic Control (AHEC) project in South Sudan. This is a justification for a limited competition action to ensure continuity of HIV/AIDS services.

Scope

  • Increase contract ceiling for HIV/AIDS epidemic control project.
  • Integrate additional HIV/AIDS programs and patient care in South Sudan.
Local presence required

How to get the bid documents

  1. Download the 1 document below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before the deadline
Documents · 1 item, 1 file
  • PDF
    JA - S. Sudan AHEC - New_Redacted.pdf3.2 MB · 11 pages
Open the original listing on SAM.gov

Details

Place of performance
WASHINGTON, District of Columbia
Buyer type
Federal
Notice type
Justification
Solicitation no.
72066821C00001P00025
NAICS
NAICS 541611 (Administrative Management and General Management Consulting Services): 7 open RFPs
Size standard
$24.5M revenue SBA table, NAICS 541611
PSC
PSC R408 (SUPPORT- PROFESSIONAL: PROGRAM MANAGEMENT/SUPPORT): 8 open RFPs
Delivery location
South Sudan from attachment p.2
Period of performance
through September 2028 from attachment p.2
Local presence
Required
Amendments
1, last Oct 7
Contact
Wade Ward
Office
ACQUISITIONS - AQM MOMENTUM
Email
WardBW@state.gov
Phone
2023744491

Not stated in the notice: estimated value, contract type. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Tue, Sep 15Posted
Not statedQuestions due
Not statedResponses due
Amendment 1
Wed, Oct 7 · The justification and authority for limiting competition have been clarified and expanded upon in the updated procurement notice.

Change log

verified Sat, Oct 10 · 12:30 AM ET
  1. Posted · JustificationTue, Sep 15 · 4:12 AM ET
  2. Amendment · The justification and authority for limiting competition have been clarified and expanded upon in the updated procurement notice.Wed, Oct 7 · 12:32 AM ET
Report a problem

Notice as published

Advancing HIV & AIDS Epidemic Control (AHEC) Project

This acquisition is conducted under the authority of 40 U.S.C. 113, as implemented by AIDAR 706.302- 70(b)(3)(ii), and substantiated by the Expedited Procedures Package (EPP). AIDAR 706.302-70(b)(3) and FAR 6.303-2 allows USAID (now the Department of State) to limit competition when compliance with full and open competition procedures would impair foreign assistance objectives.

More specifically, AIDAR 706.302-70(b)(3)(ii) states that full and open competition is not required for: Awards for countries, regions, projects, or programs for which the Administration of USAID makes a formal written determination with supporting findings (D&F), see Attachment 1 to this J&A, that compliance with full and open competition procedures would impair foreign assistance programs. The authority for the D&F under the HIV/AIDS EPP is based on 40 U.S.C. 113(e)(2) and 48 CFR 706.302-70.

Tab 1 of the EPP procedures, specifically the D&F, is provided as Attachment 1 to this J&A.The EPP specifically authorizes the use of AIDAR 706.302-70(b)(3)(ii) for contract actions, stating "You have the authority to extend the EPP under the following: for contracts, Section 706.302-70(b)(3)(ii) of USAID's Acquisition Regulation (AIDAR), Impairment of Foreign Aid Programs; for assistance awards, ADS Chapter 303.3.6.5, Restrictions to Eligibility; and for the source-and-nationality waiver, Section 228.31 of Title 22 of the Code of Federal Regulations (CFR)." The current EPP is effective from January 1, 2025, through December 31, 2029, and was approved by the USAID Administrator. Although the EPP is specific to USAID, a memorandum of understanding between USAID and the Department of State delegates authority to DOS to carry out applicable PEPFAR programming under USAID procedures and regulations. Accordingly, this justification relies on AIDAR 706.302-70 as the basis for limiting competition, as proceeding with full and open competition at this stage would risk impairing the effective implementation of a critical foreign assistance program

What this office paid before

USAspending.gov, last 36 months

25 awards matched · tier 1: this contracting office (19AQMM) + PSC R408. Most recent:

Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 10, 2026 · 12:48 AM ET.

This contracting office

41 other open notices from this office · buys mostly Supplies & Equipment, Other, Training

Similar open RFPs

same PSC R408

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov