Sign inGet alerts

Closed Tue, Oct 6. Responses were due Tue, Oct 6 · 3:30 PM ET. This notice is kept for reference and no longer takes responses.

Invitation to BidConstructionState buyer

Addendum 1 BDC02-26/27 Blue Spring - Restroom Replacement

Unverified · check source
Responses dueTue, Oct 63:30 PM ET · Florida timeClosed
PostedWed, Sep 16No amendments since
Solicitation no.BDC02-26/27 AD1MyFloridaMarketPlace (MFMP) Vendor Bid System
Set-asideNoneOpen to all firms

What the state is buying

from the notice as published

September 16, 2026 NOTICE TO APPLICANTS ADDENDUM NO. ONE (1) Blue Spring State Park - Restroom Replacement DEP BID NO. BDC02-26/27 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when…

How to get the bid documents

Documents · 1 item, 1 file
  • PDF
    BDC02-26-27 Addendum 1.pdflogin required at source
Open the original listing on the agency portal

Details

Place of performance
Tallahassee, Florida
Buyer type
State
Notice type
Invitation to Bid
Solicitation no.
BDC02-26/27 AD1
Category
Construction
Amendments
None since Sep 16
Contact
Logan Lee-Marple
Email
Logan.LeeMarple@floridadep.gov
Phone
(850) 245-2519

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Sep 16Posted
Not statedQuestions due
Tue, Oct 6 · 3:30 PM ETResponses due · closed
Closed
Tue, Oct 6

Change log

verified Tue, Oct 6 · 2:15 PM ET
  1. Posted · Invitation to BidWed, Sep 16 · 10:48 AM ET
  2. ClosedTue, Oct 6 · 8:15 PM ET
Report a problem

Notice as published

Addendum 1 BDC02-26/27 Blue Spring - Restroom Replacement

September 16, 2026

NOTICE TO APPLICANTS

ADDENDUM NO. ONE (1)

Blue Spring State Park - Restroom Replacement

DEP BID NO. BDC02-26/27

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1.

Question: Must the employees whose work will be counted toward the required 15% be directly employed by [Contractor] and on its direct payroll at the time of Bid Opening, or may employees hired after Bid Opening or after award to perform construction work on the project also be counted toward the 15% requirement?

Answer: The employees do not have to be employed at the time of the Bid Opening. They may be hired after the award is posted.

2.

Question: Can work performed by [Contractor’s] General Contractor, Project Manager, Superintendent/Supervisor, scheduler, or procurement/purchasing personnel be included in the calculation of the 15%?

Answer: Yes, they can be included in the calculation.

3.

Question: Can project management and administrative personnel be included in the calculation, or must the 15% consist exclusively of employees performing physical construction work?

Answer: Yes, they can be included in the calculation.

4.

Question: If the 15% must include physical construction work, could you please clarify what types of construction work would qualify? For example, would concrete, masonry/block, carpentry, finishes, roofing, or other construction activities performed directly by [Contractor] employees qualify toward the 15% requirement?

Answer: All types of construction work are included.

5.

Question: Is the 15% calculated based on the total contract value, the value of the construction work, labor costs, labor hours, or another methodology?

Answer: It is based on the total contract value.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Listing collected from MyFloridaMarketPlace (MFMP) Vendor Bid System. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site