Compliance checklist
54-ML-PR40208 Aluminum Box Culvert with Headwalls for Lee Co. Bridge Maintenance · 54-ML-PR40208. 93 requirement sentences found in the notice and 1 attachment: every "shall", "must" and "required", quoted as written and sorted into submission requirements (6) and performance / contract clauses (87). Nothing is generated.
The full checklist is a Pro feature
93 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.
Sign in or upgradeSubmission requirements · 6
IFB-ML-PR40208 Aluminum BoxCulvert with Headwalls.pdf · 2.6 BID SUBMITTAL · 2
IFB-ML-PR40208 Aluminum BoxCulvert with Headwalls.pdf · 2.7 BID CONTENTS · 1
Performance / contract clauses · 87
IFB-ML-PR40208 Aluminum BoxCulvert with Headwalls.pdf · STATE OF NORTH CAROLINA · 2
IFB-ML-PR40208 Aluminum BoxCulvert with Headwalls.pdf · VALIDITY PERIOD · 2
Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.