What the county is buying
by RFPFinder from the notice and attachments; the solicitation governsPaulding County Government seeks construction of a new pressure reducing valve and flow meter vault at Richland Creek Water Treatment Plant, including piping, electrical and instrumentation work. Award will be made to the lowest responsive responsible bidder via sealed bid.
Scope
- Construction of underground PRV and FM vault with precast concrete and access components
- Installation of piping, valves, electrical power and instrumentation for flow and pressure monitoring
How to get the bid documents
- Download the 1 document below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit as the notice directs before 10:00 AM ET on Nov 13
Details
- Place of performance
- Georgia
- Buyer type
- County
- Notice type
- Non-State Agency
- Solicitation no.
- PE-77892-NONST-2027-000000094
- Delivery location
- Richland Creek Water Treatment Plant from notice
- Local presence
- Not required
- Amendments
- None since Oct 9
- tgoldin@paulding.gov
Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Sat, Oct 10 · 8:15 AM ETNo amendments since posting on Fri, Oct 9; verified Sat, Oct 10 · 8:15 AM ET.
Report a problem
Notice as published
27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault
The Project consists of construction of a new pressure reducing valve (PRV) and flow meter (FM) vault, with associated piping and appurtenances at the Richland Creek Water Treatment Plant to regulate pressure in the plant feed piping and provide flow monitoring. The scope will include, but is not limited to, the following major elements: ' Construction of a new underground PRV and FM vault, including a precast concrete vault, access hatches, and an internal access ladder. ' Installation of new finished water piping and sample line within and outside the vault, including all required fittings, restraints, and connections to existing water mains. ' Furnishing and installation of a PRV, FM assembly, isolation and bypass valves, and associated mechanical appurtenances. ' Provision and installation of electrical power, grounding, and instrumentation necessary for flow and pressure monitoring, including conduits and wiring for integration with the existing control system.
Similar open RFPs
same contracting officeListing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.