Sign inGet alerts

Compliance checklist

27008-4401, FY 2027 Stormwater Infrastructure Replacement & Repair Unit Price Contract · PE-77892-NONST-2027-000000095. 11 requirement sentences found in the notice and 1 attachment: every "shall", "must" and "required", quoted as written and sorted into submission requirements (2) and performance / contract clauses (9). Nothing is generated.

Pro

The full checklist is a Pro feature

11 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.

Sign in or upgrade

Submission requirements · 2

3 _FY 27 SW UPC Advertisement 10_08_2026 (1).pdf · FY 27 Stormwater Infrastructure Replace · 1

3 _FY 27 SW UPC Advertisement 10_08_2026 (1).pdf · Page 2 · 1

Performance / contract clauses · 9

3 _FY 27 SW UPC Advertisement 10_08_2026 (1).pdf · FY 27 Stormwater Infrastructure Replace · 2

3 _FY 27 SW UPC Advertisement 10_08_2026 (1).pdf · Page 2 · 1

Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.