What the city is buying
by RFPFinder from the notice and attachments; the solicitation governsThe City of Rocky Mount is seeking bids for a transformer upgrade at Substation 10, which includes the installation of an oil containment system. The contract type is unit pricing for labor and materials, and offers will be evaluated based on the provided pricing proposal.
Scope
- Install an oil containment system for a power transformer.
- Furnish labor and materials for concrete basins, pumps, and electrical/plumbing.
1 signal behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 5 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit through NC Division of Purchase & Contract - Electronic Vendor Portal (eVP) (free account) before 10:00 AM ET on Oct 14
To submit, you need a free account at NC Division of Purchase & Contract - Electronic Vendor Portal (eVP).
Details
- Place of performance
- North Carolina
- Buyer type
- City
- Notice type
- RFP
- Solicitation no.
- 320-040226FD Re-Bid
- Category
- Construction
- Delivery location
- Substation 10, Rocky Mount, North Carolina from attachment p.7
- Contract type
- Unit Pricing from attachment p.1
- Estimated value
- $1.5M from notice
- Local presence
- Not required
- Amendments
- None since Oct 5
- Contact
- Alicia Gaines
Not stated in the notice: period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Thu, Oct 8 · 8:15 AM ETNo amendments since posting on Mon, Oct 5; verified Thu, Oct 8 · 8:15 AM ET.
Report a problem
Notice as published
Substation 10 Transformer Upgrade Re-Bid
General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment System for the transformer which has been designed to contain accidental spills and/or tank rupture within the area surrounding the power transformer. The installation of this system involves the excavation of a large basin around the transformer foundation.
The basin will be permanently formed with reinforced concrete walls and floors. The containment basin is designed with concrete flush splash pads to allow all rainwater to drain out at a single outlet. The Contractor shall be responsible for furnishing the labor and materials to install the concrete basins, and shall be responsible for the labor to complete the installation of the pumps and all associated electrical/plumbing materials for a complete system.
The Contractor shall furnish the mechanical sump package as outlined in the "List of Materials for the Oil Containment System" following these specifications. The Contractor shall furnish all concrete, reinforcing steel, galvanized steel bar grating, and framing materials for the concrete basin.
Listing collected from NC Division of Purchase & Contract - Electronic Vendor Portal (eVP). Always confirm requirements in the original solicitation before you bid.