Get alerts
Closes in 40 hoursResponses due Fri, Oct 9 at 10:00 AM ET · about 40 hours left

RFP2027-02 Lewis Frasier Middle School Boiler Replacement

Verified 4 h agoLocal presence required
Responses dueFri, Oct 910:00 AM ET · Georgia timeabout 40 hours left
PostedWed, Sep 9No amendments since
Solicitation no.PE-68910-NONST-2027-000000052Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace
Set-asideNoneOpen to all firms

What the county is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Liberty County Board of Education is seeking bids for the replacement of the boiler at Lewis Frasier Middle School. This is a construction contract, and offers will be evaluated based on criteria outlined in the Invitation for Bid packet.

Scope

  • Boiler replacement at Lewis Frasier Middle School.
  • Includes HVAC, electrical, and general construction work.
Local presence requiredSubmission: physicalDays to respond: 2
CompetitionCompetition unknownNo award history or sole-source language found for this buyer and code.

From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.

How to get the bid documents

  1. Download the 5 stored documents below; 1 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by physical before 10:00 AM ET on Oct 9
Documents · 6 items, 6 filesDownload all (zip)
  • PDF
    2027_02 LFMS Boiler Replacement ITB.pdf147 KB · 1 page
  • PDF
    2027_02 Bid Requirements _ LFMS Bid Requireme.pdf1.5 MB · 18 pages
  • PDF
    LCSS 2027_02 L Frazier MS Boiler Replacement .pdf1.7 MB · 4 pages
  • PDF
    LCSS 2027_02 L Frazier MS Boiler SPECS.pdf3.7 MB · 132 pages
  • PDF
    Addendum _1 _ 2027_02 LFMS Boiler Replacemen.pdf193 KB · 2 pages
  • PDF
    Addendum _2 _ 2027_02 LFMS Boiler Replacemen.pdffetching
Open the original listing on the agency portal

Details

Place of performance
Georgia
Buyer type
School district
Notice type
Non-State Agency
Solicitation no.
PE-68910-NONST-2027-000000052
Category
Construction
Delivery location
Lewis Frasier Middle School, 910 Long Frasier Dr, Hinesville, GA 31313 from notice
Contract type
unknown from notice
Local presence
Required
Amendments
None since Sep 9
Email
aatkinson@liberty.k12.ga.us

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Sep 9Posted
Sep 22Pre-bid held
Fri, Oct 9 · 10:00 AM ETResponses due · about 40 hours left Under 14 days

Change log

verified Wed, Oct 7 · 2:17 PM ET

No amendments since posting on Wed, Sep 9; verified Wed, Oct 7 · 2:17 PM ET.

Report a problem

Notice as published

RFP2027-02 Lewis Frasier Middle School Boiler Replacement

The Liberty County School System wishes to announce that we are requesting bids for Lewis Frasier Middle School Boiler Replacement, RFP#2027-02 by a firm authorized to do business in the State of Georgia. A Pre-Bid Conference will be held on September 22nd, 2026, at 10:00 AM., Lewis Frasier Middle School, located at 910 Long Frasier Dr, Hinesville. GA 31313 ..

All prospective bidders are strongly encouraged to attend.

Enclosed is an Invitation of Bid (1TB) packet, which outlines the services being solicited, and instructions, describing the submission of the Statement of Qualifications (sometimes referred to herein as "statement(s)" or "bid(s)"). This cover letter is not a part of the Bid Documents and information herein is for reference only. All Bids should be delivered to the Board of Education (BOE) at, 200 Bradwell Street, Hinesville, Georgia 31313.

The advertising dates for this RFP 2027-02 are September 9, 2026, through October 9th, 2026. Bids will be accepted prior to 10:00 AM. on , October 9th 2026, at which time they will be entered into a register.

Bids received after the time and date for submittal stipulated in the 1TB will not be opened or considered and will be returned to the Offerer unopened. The time stamp at the BOE shall determine the time of receipt. Offerers are responsible for ensuring that their Bids are stamped by BOE personnel before the deadline indicated.

Listing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site