Get alerts

OTAG - New Flagpole Installation

Responses dueFri, Oct 235:59 PM PT · Nevada time16 days left
PostedWed, Oct 7No amendments since
Solicitation no.43ADG-S4036Nevada State Purchasing Division - NevadaEPro
Set-asideNoneOpen to all firms

What the state is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Adjutant General is seeking a contractor to install a new 35ft flagpole at the OTAG building. This is a firm-fixed-price contract, and offers will be evaluated based on unknown criteria.

Scope

  • Install a new 35ft commercial grade flagpole, including excavation and concrete work.
  • Fabricate a light cove, test halyard system, and dispose of all project materials.
Days to respond: 16

How to get the bid documents

  1. Download the 3 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit through Nevada State Purchasing Division - NevadaEPro (free account) before 5:59 PM PT on Oct 23

To submit, you need a free account at Nevada State Purchasing Division - NevadaEPro.

Documents · 3 items, 3 filesDownload all (zip)
  • PDF
    Quote Instructions216 KB · 5 pages
  • DOC
    OTAG Flag Pole Installation Invitation to Bid256 KB
  • DOC
    OTAG Flag Pole Installation Scope of Work25 KB
Open the original listing on the agency portal

Details

Place of performance
Nevada
Buyer type
State
Notice type
Not stated
Solicitation no.
43ADG-S4036
Quantity
1 each from notice
Delivery location
OTAG building from notice
Contract type
Firm-fixed-price from notice
Local presence
Not required
Amendments
None since Oct 7
Contact
Theresa Sianez

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Oct 7Posted
Not statedQuestions due
Fri, Oct 23 · 5:59 PM PTResponses due · 16 days left

Change log

verified Wed, Oct 7 · 5:16 PM PT

No amendments since posting on Wed, Oct 7; verified Wed, Oct 7 · 5:16 PM PT.

Report a problem

Notice as published

OTAG - New Flagpole Installation

The contractor shall install a new 35ft flagpole in front of the OTAG building. Contractor is responsible for all materials, tools, hardware, and labor to complete this project. Contractor is also responsible for properly disposing of all materials that have been removed from this project.

Contractor is responsible for contacting 811 to clear all underground utilities prior to any excavation. Contractor is to provide a new 35ft commercial grade flagpole. Contractor is to core concrete and excavate, install flagpole sleeve and flagpole per manufactures specs.

Repair any sidewalk that was removed to install new 35ft flagpole. if needed Fabricate a light cove for the existing inner lights to accept 4 new upper lights. 2 will face each outer existing flagpole. 2 will face the new flagpole.

Property test the halyard system to verify smooth, binding-free operation of the truck pulley, cleat/winch and swivel snaps. Contractor must thoroughly clean the work area and properly dispose of all materials used and removed from this project.

Listing collected from Nevada State Purchasing Division - NevadaEPro. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site