Get alerts

ODOT McKenzie Bridge Maintenance Station Roof Replacement

Responses dueTue, Oct 202:00 PM PT · Oregon time11 days left
PostedMon, Sep 21No amendments since
Solicitation no.S-73000-00017809Oregon DAS - OregonBuys
Set-asideNoneOpen to all firms
Estimated value$150Kfrom $75K · from notice

What the state is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Oregon Department of Transportation is seeking a qualified contractor to replace a metal roof at the McKenzie Bridge Maintenance Station. This will be a firm-fixed-price contract, and offers will be evaluated based on unknown criteria.

Scope

  • Replace a metal roof at the ODOT McKenzie Bridge Maintenance Station.
  • Project range estimate: $75,000 - $150,000.
Days to respond: 11

How to get the bid documents

  1. Download the 4 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit through Oregon DAS - OregonBuys (free account) before 2:00 PM PT on Oct 20

To submit, you need a free account at Oregon DAS - OregonBuys.

Documents · 4 items, 4 filesDownload all (zip) · Pro
  • DOCX
    00017809_ITB .docx163 KB
  • DOC
    Att A_Project Overview and General Specs~1.doc141 KB
  • PDF
    Att C_Plans.pdf592 KB · 3 pages
  • DOCX
    Att B_v2_Technical Specifications with markup.docx67 KB
Open the original listing on the agency portal

Details

Place of performance
Oregon
Buyer type
State
Notice type
Not stated
Solicitation no.
S-73000-00017809
Category
Construction
Delivery location
ODOT McKenzie Bridge Maintenance Station from notice
Contract type
Firm-fixed-price from notice
Estimated value
$150K from notice
Local presence
Not required
Amendments
None since Sep 21
Contact
Joanne Robinson
Email
joanne.m.robinson@odot.oregon.gov
Phone
503-569-8015

Not stated in the notice: period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Mon, Sep 21Posted
Oct 6Pre-bid held
Tue, Oct 20 · 2:00 PM PTResponses due · 11 days left Under 14 days

Change log

verified Fri, Oct 9 · 5:17 AM PT

No amendments since posting on Mon, Sep 21; verified Fri, Oct 9 · 5:17 AM PT.

Report a problem

Notice as published

ODOT McKenzie Bridge Maintenance Station Roof Replacement

ODOT is seeking one qualified contractor to replace a metal roof at the ODOT McKenzie Bridge Maintenance Station.

PROJECT RANGE ESTIMATE: $75k - $150k

Replace metal roof at ODOT McKenzie Maintenance Station as specified.

Pre-bid conference: Non-mandatory pre-bid conference will be held at the project site on October 6 at 9:30 am. See ITB document for details.

Listing collected from Oregon DAS - OregonBuys. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site