Compliance checklist
FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma · W912BV279A001. 35 requirement sentences found in the notice and 4 attachments: every "shall", "must" and "required", quoted as written and sorted into submission requirements (4) and performance / contract clauses (31). Nothing is generated.
The full checklist is a Pro feature
35 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.
Sign in or upgradeSubmission requirements · 4
RFQ No. W9124BV279A001 Altus AFB KC-46A Aircraft Beddown Infrastructure 10.2.26.pdf · 7.0 · 1
RFQ No. W9124BV279A001 Altus AFB KC-46A Aircraft Beddown Infrastructure 10.2.26.pdf · 8.2 · 1
Performance / contract clauses · 31
RFQ No. W9124BV279A001 Altus AFB KC-46A Aircraft Beddown Infrastructure 10.2.26.pdf · DESC · 1
RFQ No. W9124BV279A001 Altus AFB KC-46A Aircraft Beddown Infrastructure 10.2.26.pdf · 2.0 · 1
Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.