Open RFPs / Construction Services for the Gate 7 Parking Garage St. Eliz / Compliance checklist Compliance checklist Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus · 47PB51-26-R-0038. 450 requirement sentences found in the notice and 6 attachments: every "shall", "must" and "required", quoted as written and sorted into submission requirements (22) and performance / contract clauses (428). Nothing is generated.
Pro The full checklist is a Pro feature 450 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.
Sign in or upgrade
Submission requirements · 22 26-0918_Gate 7 Garage_Final DBB SOW FY25 v1.pdf · A. Project Description · 1
Performance / contract clauses · 428 Notice · 2 The contractor will be required to coordinate construction activities with ongoing campus operations, security requirements, occupied facilities, existing utilities, shuttle operations, adjacent work, traffic and access impacts, and protection of historic and environmental resources. The contractor may also be required to coordinate with District of Columbia agencies or authorities, as applicable, for traffic control, haul routes, public space, utility, roadway, permit, or other construction-related requirements. 26-0918_Gate 7 Garage_Final DBB SOW FY25 v1.pdf · I. SUMMARY · 2 The Contractor shall provide all management, supervision, labor, materials, equipment, tools, supplies, temporary facilities, coordination, quality control, safety management, testing, inspections, construction-phase submittals, construction engineering for means and methods, commissioning support, closeout documentation, and other services required to construct the project in accordance with the contract documents. The Contractor shall coordinate with GSA, AECOM, ZGF, DHS, campus operations personnel, security personnel, the Operations and Maintenance contractor, utility providers, and other GSA-designated stakeholders throughout the project.
Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.