Get alerts

16--SERVOVALVE,HYDRAULI, IN REPAIR/MODIFICATION OF

DEPT OF DEFENSE, Pennsylvania · DEPT OF THE NAVY · NAVSUP WEAPON SYSTEMS SUPPORT
Responses dueThu, Oct 294:30 PM ET · Pennsylvania time22 days left
PostedTue, Sep 29No amendments since
Solicitation no.N00383-26-Q-BB20SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Department of Defense is seeking repair and modification services for servovalves. This will be a lowest price technically acceptable award.

Scope

  • Repair and modification of servovalves.
  • Contractor to provide all necessary facilities, labor, materials, parts, and equipment.
Lowest price, technically acceptableSubmission: emailDays to respond: 22
CompetitionLikely competitive

1 signal behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.

From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.

How to get the bid documents

  1. Download the 1 stored document below; 1 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by email before 4:30 PM ET on Oct 29
Documents · 2 items, 2 files
  • DOC
    https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0038326QBB20external link
  • PDF
    N0038326QBB20.pdf672 KB · 54 pages
Open the original listing on SAM.gov

Details

Place of performance
PHILADELPHIA, Pennsylvania
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
N00383-26-Q-BB20
Category
Supplies & Equipment
NAICS
NAICS 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing)
PSC
PSC 1650 (AIRCRAFT HYDRAULIC, VACUUM, AND DE-ICING SYSTEM COMPONENTS): 49 open RFPs
Quantity
2 units from notice
Period of performance
365 calendar days from contract award, with an option to extend by an additional 365 days. from notice
Evaluation
Lowest price technically acceptable from notice
NSN
1650-01-129-3814 from notice
Part number
A38013-1 from notice
Local presence
Not required
Amendments
None since Sep 29
Contact
Telephone: 2156973992
Office
DEPT OF THE NAVY · NAVSUP WEAPON SYSTEMS SUPPORT
Email
LINDA.VONG2.CIV@US.NAVY.MIL

Not stated in the notice: estimated value, contract type, FOB terms. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Tue, Sep 29Posted
Not statedQuestions due
Thu, Oct 29 · 4:30 PM ETResponses due · 22 days left

Change log

verified Wed, Oct 7 · 12:30 AM ET

No amendments since posting on Tue, Sep 29; verified Wed, Oct 7 · 12:30 AM ET.

Report a problem

Notice as published

16--SERVOVALVE,HYDRAULI, IN REPAIR/MODIFICATION OF

^NOTE

^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. SERVOVALVE,HYDRAULI ;MOOG INC; Company Name , ;400 Jamison Rd Elma, NY 14059; Address , ;94697; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program.

The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements.

Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).

3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.

  1. QUALITY ASSURANCE DCMA HAS OVERSIGHT ON ALL REPAIR CONTRACTS. 4.1 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.1.1 Dimensional test (special) ;N/A; 4.1.2 Requirements of: ;A1-488PA-120-100 and NAVAIR approved equivilant; 4.1.3 Form ;N/A; 4.1.4 Fit ;N/A; 4.1.5 Function ;A1-488PA-120-100 and / or NAVAIR approved equivalant; 4.1.6 Compliance with drawing ( ;(94697); ) ;A38013-1; , Revision ;Latest; and specifications referenced therein.

4.2 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.3 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.4 The contractor shall notify the PCO, ACO, and QAR fourteen

  1. days prior to conducting the First Article test so that the Government may witness such testing.

4.4.1 The QAR shall be present to witness all First Article Testing. 4.4.2 The following additional personnel shall witness the First Article Testing: ;DCMA NAVAIR NAVSUP; 4.5 Disposition of FAT samples 4.5.1 ;N/A; Sample(s) may be destroyed during testing. 4.5.2 ; ; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR.

Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.6 Test Sample Coating Instructions 4.6.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required.

4.7 Notice to Government of Testing at the contractors facility. 4.7.1 FAR 52.209-3 applies (A) The contractor shall present ;1; ; unit(s) of the following CAGE( ;(94697); ; ), Part Number ;A38013-1; ; , Revision ;Latest; ; as specified in this contract. At least fourteen

  1. calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;DCMA NAVAIR NAVSUP; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article.

The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval.

(D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.

The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract.

(F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor.

Before First Article approval, the costs thereof shall not be allocated to this contract for

  1. progress payments, or
  2. termination settlements if the contract is terminated for the convenience of the Government.

The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33).

The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report.

4.8 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three

  1. years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run.

Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval.

These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.9 .

Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI).

1.

Critical characteristics: 100% inspection shall apply. 2.

Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B.

Critical characteristics: ;NONE; C. Major and Minor characteristics 1.

Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

  1. NOTES - NOT APPLICABLE
Clauses and provisions listed on the notice (17)

CONTACT INFORMATION · 229 0616 · ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) · HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT · WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) · NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18)) · MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE · WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) · EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) · BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) · LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026) · SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) · BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)) · BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) · ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026)) · ROYALTY INFORMATION (APR 1984) · NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))

What this office paid before

USAspending.gov, last 36 months

No USAspending award found for NSN 1650-01-129-3814 or part number A38013-1 in 36 months.

25 awards matched · tier 1: this contracting office (N00383) + PSC 1650. Most recent:

Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Wed, Oct 7, 2026 · 11:27 AM ET.

This contracting office

652 other open notices from this office · buys mostly Supplies & Equipment, Equipment Maintenance & Repair, Other

Related notices

Similar open RFPs

same PSC 1650

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov